에너지 및 환경 · 1994. 7. 19.1 분 읽기
Shieldalloy Metallurgical Corporation, Establishment of Local Public Document Room
로컬 자동 번역 · 원본 출처 언어
요약
Shieldalloy Metallurgical Corporation, Establishment of Local Public Document Room
에너지 및 환경 · 1994. 7. 19.1 분 읽기
로컬 자동 번역 · 원본 출처 언어
요약
Shieldalloy Metallurgical Corporation, Establishment of Local Public Document Room
관련 인사이트
비즈니스 인사이트 →관련 비즈니스 신호
5에너지 및 환경 · 2026. 8. 26.
The U.S. Nuclear Regulatory Commission (NRC) is providing public notice each week, for four consecutive weeks, of receipt and availability of an application for renewal of early site permit (ESP) ESP-003 for the North Anna ESP site from Virginia Electric and Power Company, doing business as (dba) Dominion Energy Virginia. Renewal of the ESP would allow the licensee to reference ESP-003 in a construction permit (CP) or combined license (COL) application for an additional 20- year period beyond the period specified in the ESP. The location for the North Anna ESP site is in Louisa County, Virginia, and the current ESP-003 expires on November 27, 2027.
요약 읽기 →에너지 및 환경 · 2026. 8. 26.
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering issuance of an amendment to Renewed Facility Operating License No. NPF-76, issued to STP Nuclear Operating Company (STPNOC); Constellation South Texas, LLC; City Public Service Board of San Antonio; and City of Austin, Texas, for operation of South Texas Project, Unit 1 (STP). The proposed license amendment would, if granted, make a one-time exigent change to the technical specifications (TS) to extend the allowed outage time (AOT) for TS 3.7.1.7, "Main Feedwater System". This proposed amendment is being requested to facilitate repairs to the Unit 1 train D main feedwater isolation valve (MFIV). This proposed amendment is being requested under exigent circumstances pursuant to NRC regulations.
요약 읽기 →에너지 및 환경 · 2026. 8. 24.
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is issuing an order approving the application dated April 24, 2026, filed by Arizona Public Service Company (APS), on behalf of Public Service Company of New Mexico (PNM), Troy ParentCo LLC (Troy ParentCo), and their corporate affiliates (together, Applicants). The application sought NRC consent to the indirect transfer of control of PNM's co- ownership of the Renewed Facility Operating License Nos. NPF-41, NPF- 51, and NPF-74 for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively, as well as the associated general license for the Palo Verde Independent Spent Fuel Storage Installation (ISFSI) (together, the facility). No physical changes or operational changes to the facility were proposed in the application.
요약 읽기 →에너지 및 환경 · 2026. 8. 21.
The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on its draft Interim Staff Guidance (ISG), OAR/DARP-ISG- 2026-XX, "Evaluations of Risk Assessments for Risk-Informed Decision- Making for Regulatory Applications." If finalized, this ISG will provide guidance to the staff for reviewing systematic risk assessment methods, including probabilistic risk assessments (PRAs) and other systematic risk evaluations (SREs). This ISG will supplement existing guidance to facilitate the staff's understanding of the uses of risk information in regulatory applications and application of principles of risk-informed decision-making.
요약 읽기 →에너지 및 환경 · 2026. 8. 21.
On July 22, 2026, the U.S. Nuclear Regulatory Commission (NRC) solicited comments on draft NUREG-1220, Revision 2, "Training Review Criteria and Procedures." The public comment period was originally scheduled to close on August 21, 2026. The NRC has decided to extend the public comment to September 21, 2026, to allow more time for members of the public to prepare and submit their comments.
요약 읽기 →