規制と法律 · 2022/12/161 分で読めます
Notice of Intent To Prepare an Environmental Impact Statement for the Grain Belt Express Transmission Line Project, DOE/EIS-0554
ローカル自動翻訳 · 情報源の原言語
概要
Consistent with the regulations implementing the National Environmental Policy Act (NEPA), the U.S. Department of Energy (DOE), Loan Programs Office (LPO), announces its intent to prepare an environmental impact statement (EIS) to consider the environmental impacts associated with providing potential financial assistance (a federal loan guarantee) to Grain Belt Express, LLC, for construction and energization of Phase 1 of the Grain Belt Express Transmission Line Project (Grain Belt Express Project). The Grain Belt Express Project consists of an approximately 530-mile-long high-voltage direct-current (HVDC) transmission line, with a terminus in Ford County, Kansas, and a terminus in Monroe County, Missouri; two HVDC converter stations; a 1,000-foot alternating-current (AC) transmission line from the HVDC converter station at the terminus of the Ford County, Kansas HVDC transmission line to an existing substation; and an approximately 40- mile AC transmission line from the HVDC converter station at the terminus of the Monroe County, Missouri HVDC transmission line to an existing substation and a proposed substation, both in Callaway County, Missouri. This notice of intent (NOI) annou