エネルギーと環境 · 2018/12/41 分で読めます
Fuel Cycle Safety, Safeguards, and Environmental Review Interim Staff Guidance
ローカル自動翻訳 · 情報源の原言語
概要
The U.S. Nuclear Regulatory Commission (NRC) is announcing the withdrawal of several Interim Staff Guidance (ISG) documents associated with fuel cycle facilities. These documents are being withdrawn because the guidance contained in the documents have since been incorporated into NUREG-1520, "Standard Review Plan for Fuel Cycle Facilities License Applications."