Energía y medio ambiente · 4/12/20181 min de lectura
Fuel Cycle Safety, Safeguards, and Environmental Review Interim Staff Guidance
Traducción automática local · Idioma original de la fuente
Resumen
The U.S. Nuclear Regulatory Commission (NRC) is announcing the withdrawal of several Interim Staff Guidance (ISG) documents associated with fuel cycle facilities. These documents are being withdrawn because the guidance contained in the documents have since been incorporated into NUREG-1520, "Standard Review Plan for Fuel Cycle Facilities License Applications."