BN Business News
会社を追加 →
この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。

規制と法律 · 2005/11/181 分で読めます

Notice of Intent To Prepare an Environmental Assessment and To Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement; Montana Alberta Tie, Ltd.

ローカル自動翻訳 · 情報源の原言語

概要

The Department of Energy (DOE) announces its intention to prepare an environmental assessment (EA) and to conduct public scoping meetings on an application for a Presidential permit to construct a new international transmission line that crosses the U.S.-Canada international border in northwest Montana. The EA will be prepared in compliance with the National Environmental Policy Act (NEPA) and applicable regulations, including DOE NEPA implementing regulations at 10 CFR part 1021. Montana Alberta Tie, Ltd., (MATL) has applied to DOE's Office of Electricity Delivery and Energy Reliability (OE) for a Presidential permit to construct a 230,000-volt (230-kV) electric transmission line across the U.S. border with Canada, and to the State of Montana Department of Environmental Quality (DEQ) for a Linear Facilities construction permit. The proposed transmission line would originate at a new substation to be constructed northeast of Lethbridge, Alberta, Canada, cross the U.S.-Canada international border, and terminate north of Great Falls, Montana, at an existing 230-kV substation owned by NorthWestern Energy (NWE). The total length of the proposed transmission line would be 203 miles, wit

情報源の原言語: Federal Register — All Documents原文の発表を開く →

関連インサイト

ビジネスインサイト →