BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Imprese · 10/04/20122 min di lettura

Lake Tahoe Basin Management Unit and Tahoe National Forest, CA; Calpeco 625 and 650 Electrical Line Upgrade Project EIS/EIS/EIR

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

Notice is hereby given that the USDA Forest Service (USFS), Lake Tahoe Basin Management Unit (LTBMU), together with the Tahoe Regional Planning Agency (TRPA), and the California Public Utilities Commission (CPUC) will prepare a joint Environmental Impact Statement (EIS), EIS, and Environmental Impact Report (EIR) (EIS/EIS/EIR; the nature of this type of document is described further below) to disclose the impacts associated with the following proposed action: California Pacific Electric Company (Calpeco) is proposing to upgrade their existing 625 and 650 60 kV transmission lines to 120 kV in order to maintain a safe and reliable electrical transmission system for the north Lake Tahoe area, while accommodating currently-expected normal growth in the area. The 650 line upgrade would involve rebuilding an approximately 10-mile section of transmission line from Truckee substation to the Kings Beach Diesel Generation Station. The majority of this line would be replaced within its current alignment. The 625 line upgrade would include approximately 15 miles of line from the Kings Beach Switching Station to the Tahoe City Substation. A significant portion of the existing 625 Line would be

Lingua originale della fonte: Federal Register — Agriculture DepartmentApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →