BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Regolamentazione e diritto · 09/12/20191 min di lettura

Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to Portsmouth Naval Shipyard Dry Dock 1 Modification and Expansion

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

NMFS has received a request from the United States Navy for the re-issuance of a previously issued incidental harassment authorization (IHA) with the only change being effective dates. The initial IHA authorized take of five species of marine mammals, by Level A and Level B harassment, incidental to construction associated with the Portsmouth Naval Shipyard Dry Dock 1 modification and expansion in Kittery, Maine. The project has been delayed and none of the work covered in the initial IHA has been conducted. The initial IHA was effective from October 1, 2019, through September 30, 2020. The Navy has requested re-issuance with new effective dates of March 1, 2020, through February 28, 2021. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NMFS is, therefore, issuing a second IHA to cover the incidental take analyzed and authorized in the initial IHA.

Lingua originale della fonte: Federal Register — All DocumentsApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →