BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 09/12/20191 min de lecture

Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to Portsmouth Naval Shipyard Dry Dock 1 Modification and Expansion

Traduction automatique locale · Langue originale de la source

Résumé

NMFS has received a request from the United States Navy for the re-issuance of a previously issued incidental harassment authorization (IHA) with the only change being effective dates. The initial IHA authorized take of five species of marine mammals, by Level A and Level B harassment, incidental to construction associated with the Portsmouth Naval Shipyard Dry Dock 1 modification and expansion in Kittery, Maine. The project has been delayed and none of the work covered in the initial IHA has been conducted. The initial IHA was effective from October 1, 2019, through September 30, 2020. The Navy has requested re-issuance with new effective dates of March 1, 2020, through February 28, 2021. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NMFS is, therefore, issuing a second IHA to cover the incidental take analyzed and authorized in the initial IHA.

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →