BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Énergie et environnement · 01/09/20111 min de lecture

Issuance of Loan Guarantee to Genesis Solar, LLC, for the Genesis Solar Energy Project

Traduction automatique locale · Langue originale de la source

Résumé

The U.S. Department of Energy (DOE) announces its decision to issue a loan guarantee under Title XVII of the Energy Policy Act of 2005 (EPAct 2005) to Genesis Solar, LLC, for construction and startup of the Genesis Solar Energy Project (GSEP), a 250-megawatt (MW) nominal capacity solar power generating facility on approximately 1,950 acres, all of which is administered by the U.S. Department of the Interior, Bureau of Land Management (BLM), in Riverside County, California. The environmental impacts of constructing and operating this project were analyzed pursuant to the National Environmental Policy Act (NEPA) in Plan Amendment/Final Environmental Impact Statement for the Genesis Solar Energy Project, Riverside County, California (75 Federal Register [FR] 52736; August 27, 2010) (Final EIS), prepared by the BLM Palm Springs-South Coast Field Office with DOE as a cooperating agency. BLM consulted DOE during preparation of the EIS, DOE provided comments, and BLM addressed those comments in the Final EIS. DOE subsequently determined that its own NEPA procedures had been satisfied and adopted the Final EIS. (75 FR 78993; December 17, 2010)

Langue originale de la source: Federal Register — Energy DepartmentOuvrir le communiqué original →

Explorer les analyses

Analyses business →