Énergie et environnement · 13/07/20211 min de lecture
Virginia Electric Power Company; North Anna Power Station, Units 1 and 2
Traduction automatique locale · Langue originale de la source
Résumé
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Facility Operating License Nos. NPF-4 and NPF-7, issued to Virginia Electric Power Company (VEPCO), for operation of the North Anna Power Station, Units 1 and 2. The proposed amendment would add a new requirement to isolate Primary Grade water from the reactor coolant system within 1 hour following a reactor shutdown from Mode 2. Additionally, it would make an editorial change to Technical Specification (TS) 5.6.5, ``Core Operating Limits Report (COLR).''