BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Énergie et environnement · 23/01/20202 min de lecture

Indian Point Nuclear Generating Unit Nos. 1, 2, and 3; Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments

Traduction automatique locale · Langue originale de la source

Résumé

The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by Entergy Nuclear Operations, Inc. (ENOI), on behalf of itself, Entergy Nuclear Indian Point 2, LLC (ENIP2), Entergy Nuclear Indian Point 3, LLC (ENIP3), Holtec International (Holtec), and Holtec Decommissioning International, LLC (HDI) (collectively, the applicants), on November 21, 2019. The application seeks NRC approval of the transfer of control of Provisional Operating License No. DPR-5 and Renewed Facility Operating License Nos. DPR-26 and DPR-64 for Indian Point Nuclear Generating, Unit Nos. 1, 2, and 3, respectively (referred to individually as IP1, IP2, or IP3, and collectively as the Indian Point Energy Center or IPEC), as well as the general license for the IPEC Independent Spent Fuel Storage Installation (ISFSI) (collectively, the licenses). Specifically, the application requests that the NRC consent to (1) the transfer of control of the licenses to Holtec subsidiaries to be known as Holtec Indian Point 2, LLC (Holtec IP2) and Holtec Indian Point 3, LLC (Holtec IP3) and (2) the transfer of ENOI's operating authority to HDI. The NRC is also considering amending the

Langue originale de la source: Federal Register — Nuclear Regulatory CommissionOuvrir le communiqué original →

Explorer les analyses

Analyses business →