Énergie et environnement · 30/11/20201 min de lecture
In the Matter of Entergy Nuclear Operations, Inc.; Entergy Nuclear Indian Point 2, LLC; Entergy Nuclear Indian Point 3, LLC; Holtec International and Holtec Decommissioning International, LLC; Indian Point Nuclear Generating Unit Nos 1, 2, and 3
Traduction automatique locale · Langue originale de la source
Résumé
The U.S. Nuclear Regulatory Commission (NRC) is issuing an Order approving the transfer of Provisional Operating License No. DPR-5 for Indian Point Nuclear Generating Station, Unit No. 1 (IP1); Renewed Facility Operating License Nos. DPR-26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3, respectively, (collectively, with IP1, the Indian Point Energy Center (IPEC)); and the general license for the IPEC independent spent fuel storage installation to Holtec International (Holtec) subsidiaries. The Holtec subsidiaries would be known as Holtec Indian Point 2, LLC (Holtec IP2) and Holtec Indian Point 3, LLC (Holtec IP3). The Order also approves the transfer of operating authority from the currently licensed operator, Entergy Nuclear Operations, Inc. (ENOI), to Holtec Decommissioning International, LLC (HDI). The NRC is also issuing conforming amendments for the facility operating licenses for administrative purposes to reflect the transfer of the licenses from ENOI to HDI and the planned name change for Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC to Holtec IP2 and Holtec IP3, respectively.