BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Entreprise · 30/05/20141 min de lecture

Basin Electric Power Cooperative, Inc.: Notice of Availability of a Final Environmental Impact Statement

Traduction automatique locale · Langue originale de la source

Résumé

The Rural Utilities Service (RUS), an agency within the U.S. Department of Agriculture (USDA), has prepared a Final Environmental Impact Statement (FEIS) to meet its responsibilities under the National Environmental Policy Act (NEPA), RUS's implementing regulations, 7 CFR part 1794, and other applicable environmental requirements related to providing financial assistance for Basin Electric Power Cooperative's (Basin Electric) proposed Antelope Valley Station (AVS) to Neset 345-kV Transmission Project (Project) in North Dakota. RUS will also use the FEIS to meet its responsibilities under Section 106 of the National Historic Preservation Act, 16 U.S.C. 470, and its implementing regulations, "Protection of Historic Properties" (36 CFR part 800). The FEIS addresses the construction, operation, and maintenance of approximately 278 miles of new 345-kV single pole transmission line, a 230-kV single pole transmission line, and a double circuit 345/115-kV transmission line, 4 new substations and a switchyard, modifications to 4 existing substations, maintenance access roads, temporary construction roads, river crossings, temporary construction staging sites, and other facilities described

Langue originale de la source: Federal Register — Agriculture DepartmentOuvrir le communiqué original →

Explorer les analyses

Analyses business →