Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 05/11/20011 min de lecture
Standards of Conduct for Transmission Providers; Notice of Extension of Time
Traduction automatique locale · Langue originale de la source
Résumé
On September 27, 2001, the Commission issued notice of proposed rulemaking addressing new standards of conduct for transmission providers (66 FR 50919, October 5, 2001). The date for filing comments is being extended at the request of the American Gas Association, the Edison Electric Institute and the Interstate Natural Gas Association of America..
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →