BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 5/11/20011 min de lectura

Standards of Conduct for Transmission Providers; Notice of Extension of Time

Traducción automática local · Idioma original de la fuente

Resumen

On September 27, 2001, the Commission issued notice of proposed rulemaking addressing new standards of conduct for transmission providers (66 FR 50919, October 5, 2001). The date for filing comments is being extended at the request of the American Gas Association, the Edison Electric Institute and the Interstate Natural Gas Association of America..

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →