BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 06/10/20001 min de lecture

Withdrawal of Notice of Intent To Prepare a Draft Environmental Impact Statement for the Whitney Point Lake Project Modification, Susquehanna River Basin Water Management Feasibility Study, Broome County, NY

Traduction automatique locale · Langue originale de la source

Résumé

The U.S. Army Corps of Engineers, Baltimore District, is withdrawing its intent to prepare a Draft Environmental Impact Statement (DEIS) for modification of the Whitney Point Lake, Broome County, New York. The Corps' environmental analyses have not identified any significant adverse impacts associated with the proposed action; therefore, intent to prepare a DEIS is hereby terminated. The Corps is preparing an Environmental Assessment (EA) for the proposed project modification. The draft EA evaluates the elimination of the 7-foot annual winter drawdown and the release of water from the lake for low flow augmentation (drought conditions) for the enhancement of acquatic habitat downstream of the lake, in the Otselic, Tioughnioga, and Chenango River reaches. The Susquehanna River Basin Commission is the non-Federal, cost-sharing partner and is participating in the feasibility study and draft EA development. The goal of this project is to provide for low flow augmentation during drought conditions and reduce the stress upon the aquatic ecosystem. Formulation of the restoration measures focus on examining existing conditions, maximizing potential benefits to the in-lake and downstream aq

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →