BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 26‏/11‏/19992 دقائق للقراءة

Transit Mixed Concrete Company Proposed Sand and Gravel Mining Operation, Soledad Canyon, Los Angeles County, California

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

In compliance with section 176 of the Federal Clean Air Act and as required by 40 CFR 93.150-160, notice is hereby given that the Bureau of Land Management (BLM) has prepared a Draft Conformity Determination regarding air quality for Transit Mixed Concrete Company's proposal to mine sand and gravel reserves in Soledad Canyon, Los Angeles County, California. The Draft Conformity Determination is provided within the Supplemental Draft Environmental Impact Statement (SDEIS) for the Project which is available for public review. The Draft Conformity Statement is required to demonstrate the Project's compliance with the provisions of 40 CFR Part 93 regarding conformity of Federal actions to State and Federal Implementation Plans. In accordance with 40 CFR 93.155 and 93.156, BLM is providing notice and is asking for written public comment on the Draft Conformity Determination before taking any formal action. Comments on the Draft Conformity Determination must be forwarded to Mr. James G. Kenna, Field Manager, of the BLM at the address listed below by January 10, 2000. Copies of the SDEIS containing the Draft Conformity Determination may be obtained by telephoning or writing to the contact

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →