BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

商业 · 2024/5/241 分钟阅读

Notice of Nonavailability Waiver of Buy America Requirements for the Nevada Department of Transportation To Purchase Certain High-Speed Rail Components

本地自动翻译 · 来源原始语言

摘要

The Federal Railroad Administration (FRA) is issuing a waiver of its Buy America requirements to the Nevada Department of Transportation (NDOT) for high-speed rail components that are not produced in the United States for use in the Brightline West High-Speed Intercity Passenger Rail System between Las Vegas, NV and Rancho Cucamonga, CA (Project). FRA selected the Project for funding under the Federal-State Partnership for Intercity Passenger Rail Program (FSP Program), and therefore FRA's Buy America requirements apply to the Project. FRA's Buy America requirements include: FRA's statutory requirements, which require 100 percent of the manufactured products, steel, and iron used in an FRA-funded project to be produced in the United States; and the Build America, Buy America Act (BABA), which requires all construction materials used in the FRA-funded project to be produced in the United States. FRA is not waiving the applicable BABA requirements for construction materials, and therefore this waiver does not apply to the construction materials used in the Project. Brightline West, the project sponsor, has selected Siemens as its preferred rolling stock vendor, and requested that FRA

来源原始语言: Federal Register — Transportation Department打开原始公告 →

探索专题

商业洞察 →