BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2026/1/291 分钟阅读

Interim Staff Guidance: Content of Risk Assessment and Severe Accident Information in Light-Water Power Reactor Construction Permit Applications

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) is issuing Interim Staff Guidance (ISG) DRA-ISG-2026-01, "Content of Risk Assessment and Severe Accident Information in Light-Water Power Reactor Construction Permit Applications" to clarify the scope and depth of the NRC staff review of the description of risk assessment and severe accident information in the Preliminary Safety Analysis Report (PSAR) for a light-water power reactor (LWR) construction permit (CP) application that uses risk assessment and severe accident information. The NRC is aware of one applicant's interest in submitting a CP application within the next few years, and this guidance is applicable to the review of all applications for a CP for a LWR but not to non-LWR applications.

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →