BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2026/4/61 分钟阅读

Tennessee Valley Authority; Clinch River Nuclear Site, Unit 1; Final Supplemental Environmental Impact Statement

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC), in cooperation with the U.S. Army Corps of Engineers, is issuing a final supplemental environmental impact statement (SEIS), "Environmental Impact Statement for a Construction Permit Application at the Clinch River Nuclear Site: Final Report." The NRC is issuing this final SEIS as part of its review of the application submitted by Tennessee Valley Authority (TVA) for a construction permit (CP) for one GE Vernova Hitachi BWRX-300 small modular reactor (SMR) at a site in Roane County, Tennessee, designated as Clinch River Nuclear Site, Unit 1 (CRN-1). TVA plans to construct and operate CRN-1 to demonstrate the feasibility of constructing and operating the BWRX-300 SMR. The final SEIS evaluates the environmental impacts of the proposed action of issuing a CP that would allow the construction of CRN-1, as well as the environmental impacts of alternatives to the proposed action.

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →