BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2024/12/311 分钟阅读

American Centrifuge Operating, LLC; American Centrifuge Plant; Environmental Assessment and Finding of No Significant Impact

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) is considering amending Special Nuclear Material (SNM) License No. SNM-2011, issued on April 13, 2007, to American Centrifuge Operating, LLC (ACO) for the operation of the American Centrifuge Plant (ACP). The NRC is considering extending authorization of the high-assay, low-enriched uranium (HALEU) demonstration program operations to continue beyond December 31, 2024, through June 30, 2025. In the event of an extension of ACO's HALEU contract with the U.S. Department of Energy (DOE), potentially the authorization would be extended through the revised contract period. For this proposed action, the NRC staff is issuing an environmental assessment (EA) and finding of no significant impact (FONSI).

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →