BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2022/7/271 分钟阅读

Notice of Segregation of Public Land for the Esmeralda Solar Projects, Esmeralda County, Nevada

本地自动翻译 · 来源原始语言

摘要

Through this notice the Bureau of Land Management (BLM) is segregating public lands included in seven (7) rights-of-way applications for the Leeward Esmeralda Renewable Energy, Connect Gen Smoky Valley, Arevia Gold Dust, Invenergy Nivloc, NextEra Esmeralda Energy Center, Red Ridge 1, and Red Ridge 2 Solar Energy Projects, from appropriation under the public land laws, including the Mining Law, but not the Mineral Leasing or Material Sales Acts, for a period of two (2) years from the date of publication of this notice, subject to valid existing rights. This segregation is to allow for the orderly administration of the public lands to facilitate consideration of development of renewable energy resources. The public lands segregated by this notice total 118,630.90 acres.

来源原始语言: Federal Register — Interior Department打开原始公告 →

探索专题

商业洞察 →