BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

商业 · 2010/12/101 分钟阅读

Safety Management System for Certificated Airports; Extension of Comment Period

本地自动翻译 · 来源原始语言

摘要

This action extends the comment period for an NPRM that was published on October 7, 2010. In that document, the FAA proposed to require each certificate holder to establish a safety management system (SMS) for its entire airfield environment (including movement and non- movement areas) to improve safety at airports hosting air carrier operations. Several associations representing airports and other aviation industry segments have requested that the FAA extend the comment period closing date to allow time to adequately analyze the NPRM and prepare comments.

来源原始语言: Federal Register — Transportation Department打开原始公告 →

探索专题

商业洞察 →