BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2021/2/41 分钟阅读

Palisades Nuclear Plant and Big Rock Point Plant Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by Entergy Nuclear Operations, Inc. (ENOI), on behalf of itself, Entergy Nuclear Palisades, LLC (ENP), Holtec International (Holtec), and Holtec Decommissioning International, LLC (HDI) (collectively, the applicants), on December 23, 2020. The application seeks NRC approval of the transfer of control of Provisional Operating License No. DPR-6 and Renewed Facility Operating License No. DPR-20 for Big Rock Point Plant (Big Rock Point) and Palisades Nuclear Plant (Palisades), respectively, as well as the general license for the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI) and the Palisades ISFSI (collectively, the licenses). Specifically, the application requests that the NRC consent to (1) the transfer of control of the licenses to Holtec and (2) the transfer of ENOI's operating authority to HDI. The NRC is also considering amending the licenses for administrative purposes to reflect the proposed transfer. The application contains sensitive unclassified non-safeguards information (SUNSI).

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →