BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2020/9/91 分钟阅读

Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) approved a request by Pacific Gas and Electric Company (PG&E, the licensee) for amendments to Facility Operating License Nos. DPR-80 and DPR-82, issued to the licensee for operation of the Diablo Canyon Nuclear Power Plant (Diablo Canyon), Units 1 and 2, located in San Luis Obispo County, California. The amendments provide a new Technical Specification (TS) 3.7.5, "Auxiliary Feedwater (AFW) System," Condition G, to address a one-time planned Diablo Canyon, Unit 1, Cycle 22, AFW system alignment for which current TS 3.7.5 would require shutdown.

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →