BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2018/9/171 分钟阅读

Drawbridge Operation Regulation; James River, Isle of Wight and Newport News, VA

本地自动翻译 · 来源原始语言

摘要

The Coast Guard has issued a temporary deviation from the operating schedule that governs the US 17/US 258/SR 32/James River Bridge, which carries US 17, US 258, and SR 32, across the James River, mile 5.0, between Isle of Wight and Newport News, VA. The deviation is necessary to facilitate bridge maintenance. This deviation allows the bridge to remain in the closed-to-navigation position.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →