BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2018/12/61 分钟阅读

Fiscal Year (FY) 2020-2021 Proposed Power and Transmission Rate Adjustments Public Hearing and Opportunities for Public Review and Comment

本地自动翻译 · 来源原始语言

摘要

Bonneville is holding a proceeding pursuant to Section 7(i) of the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) to establish power and transmission rates for FY 2020-2021. Bonneville has designated this proceeding Docket No. BP-20. The Northwest Power Act provides that Bonneville must establish, and periodically review and revise, its power and transmission rates so that they recover, in accordance with sound business principles, the costs associated with the acquisition, conservation, and transmission of electric power, including amortization of the Federal investment in the Federal Columbia River Power System (FCRPS) over a reasonable number of years, and Bonneville's other costs and expenses. For transmission rates only, the Northwest Power Act requires that the costs of the Federal transmission system be equitably allocated between Federal and non-Federal power utilizing the system. The Northwest Power Act requires that Bonneville's rates be established based on the record of a formal hearing. By this notice, Bonneville announces the commencement of a power and transmission rate adjustment proceeding for power, transmission, and ancillary

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →