BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2018/3/61 分钟阅读

FirstEnergy Nuclear Operating Company; Beaver Valley Power Station; Unit Nos. 1 and 2; Use of Optimized ZIRLOTM Fuel Rod Cladding

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to an April 9, 2017, request from FirstEnergy Nuclear Operating Company (FENOC), in order to use Optimized ZIRLO\TM\ fuel rod cladding at the Beaver Valley Power Station, Unit Nos. 1 and 2 (Beaver Valley).

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →