BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2016/11/101 分钟阅读

Fiscal Year (FY) 2018-2019 Proposed Power and Transmission Rate Adjustments Public Hearing and Opportunities for Public Review and Comment

本地自动翻译 · 来源原始语言

摘要

BPA is holding a consolidated rate proceeding, Docket No. BP- 18, to establish power and transmission rates for FY 2018-2019. The Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) provides that BPA must establish and periodically review and revise its rates so that they recover, in accordance with sound business principles, the costs associated with the acquisition, conservation, and transmission of electric power, including amortization of the Federal investment in the Federal Columbia River Power System (FCRPS) over a reasonable number of years, and BPA's other costs and expenses. The Northwest Power Act requires that BPA's rates be established based on the record of a formal hearing. For transmission rates only, the Northwest Power Act requires that the costs of the Federal transmission system be equitably allocated between Federal and non-Federal power utilizing the system. By this notice, BPA announces the commencement of a power and transmission rate adjustment proceeding for power, transmission, ancillary, and control area services rates to be effective on October 1, 2017.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →