能源与环境 · 2017/4/211 分钟阅读
In the Matter of FirstEnergy Nuclear Operating Company; Beaver Valley Power Station, Unit 2
本地自动翻译 · 来源原始语言
摘要
The U.S. Nuclear Regulatory Commission (NRC) is issuing an order approving the direct transfer of the facility operating license for Beaver Valley Power Station, Unit 2 (BVPS-2), to FirstEnergy Nuclear Generation, LLC (FENGen). The BVPS-2 is located in Beaver County, PA.