BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2015/6/111 分钟阅读

Independent Spent Fuel Storage Installation, Department of Energy; Fort St. Vrain

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a March 19, 2015 request, as supplemented April 3, and June 1, 2015, from the Department of Energy (DOE or the licensee). The exemption seeks to delay the performance of an O-ring leakage rate test specified in Technical Specification (TS) 3.3.1 of Appendix A of Special Nuclear Material License No. SNM-2504, and to delay the performance of an aging management surveillance described in the Fort St. Vrain (FSV) Final Safety Analysis Report (FSAR) to check six Fuel Storage Containers (FSCs) for hydrogen buildup, both until June, 2016.

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →