BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2015/7/141 分钟阅读

In the Matter of Duke Energy Progress, Inc., and North Carolina Eastern Municipal Power Agency; Brunswick Steam Electric Plant, Units 1 and 2

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) is issuing an Order to Duke Energy Progress, Inc. (Duke Energy) and North Carolina Eastern Municipal Power Agency (NCEMPA), approving the direct transfer of control of the Renewed Facility Operating License Nos. DPR-71 and DPR-62, and ownership interest for the Brunswick Steam Electric Plant (Brunswick), Units 1 and 2, to the extent currently held by NCEMPA. As a result of the transaction, Duke Energy will become the sole owner of the Brunswick facility and will hold 100 percent ownership of the facility. The conforming license amendments will remove references to NCEMPA. No physical changes to the facility or operational changes were proposed in the application and Duke Energy will remain as the licensed operator of the facility. This Order is effective upon issuance.

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →