BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2014/12/92 分钟阅读

Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina Electric & Gas Company; Turbine Building Battery Room and Electrical Changes

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and issuing License Amendment No. 19 to Combined Licenses (COL), NPF-93 and NPF-94. The COLs were issued to South Carolina Electric & Gas Company (SCE&G), and South Carolina Public Service Authority (the licensee), for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3 located in Fairfield County, South Carolina. The amendment consists of changes to (1) increase Non Class 1E dc and uninterruptible power supply (UPS) System (EDS) total equipment capacity, component ratings, and protective device sizing to support increased load demand, (2) relocate equipment and moving Turbine Building (TB) first bay EDS Battery Room and Charger Room. The floor elevation increases from elevation 148'-0" to elevation 148'-10" to accommodate associated equipment cabling with this activity, and (3) remove the Class 1E Class 1E dc and UPS System (IDS) Battery Back-up tie to the Non-Class 1E EDS Battery. The granting of the exemption allows the changes to Tier 1 information asked for in t

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →