本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2012/12/261 分钟阅读
Pyraflufen-Ethyl; Extension of Time-Limited Pesticide Tolerances
本地自动翻译 · 来源原始语言
摘要
This regulation extends already established time-limited tolerances for residues of pyraflufen-ethyl in or on cattle, meat byproducts; goat, meat byproducts; horse, meat byproducts; sheep, meat byproducts; and milk. Nichino America, Inc. requested the tolerance extensions under the Federal Food, Drug, and Cosmetic Act (FFDCA).
来源原始语言: Federal Register — All Documents打开原始公告 →