BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2009/9/11 分钟阅读

Job Corps: Preliminary Finding of No Significant Impact (FONSI) for Small Wind Turbine Installation at the Cassadaga, NY Job Corps Center located at 8115 Glasgow Road in Pomfret, NY 14063

本地自动翻译 · 来源原始语言

摘要

Pursuant to the Council on Environmental Quality Regulations (40 CFR part 1500-08) implementing procedural provisions of the National Environmental Policy Act (NEPA), the Department of Labor, Office of the Secretary (OSEC) in accordance with 29 CFR 11.11(d), gives notice that an Environmental Assessment (EA) has been prepared for a proposed Wind Turbine Installation to be located at the Cassadaga, NY Job Corp Center, 8115 Glasgow Road in Cassadaga (Town of Pomfret), New York 14063, and that the proposed plan for the construction of a wind turbine at the Cassadaga, NY Job Corps Center will have no significant environmental impact. This Preliminary Finding of No Significant Impact (FONSI) will be made available for public review and comment for a period of 30 days.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →