BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2009/11/41 分钟阅读

Job Corps: Final Finding of No Significant Impact (FONSI) for the Edison Job Corps Center Solar Photovoltaic (PV) Project Located at the Edison Job Corps Center, 500 Plainfield Avenue, Township of Edison, NJ 08817

本地自动翻译 · 来源原始语言

摘要

Pursuant to the Council on Environmental Quality Regulations (40 CFR part 1500-08) implementing procedural provisions of the National Environmental Policy Act (NEPA), the Department of Labor, Office of the Secretary (OSEC), in accordance with 29 CFR 11.11(d), gives final notice of the proposed construction of a solar photovoltaic system at the Edison Job Corps Center, and that this project will not have a significant adverse impact on the environment. In accordance with 29 CFR 11.11(d) and 40 CFR 1501.4(e)(2), a preliminary FONSI for the project was published in the September 1, 2009 Federal Register (74 FR 45252-45253). No comments were received regarding the preliminary FONSI. OSEC has reviewed the conclusion of the environmental assessment (EA), and agrees with the finding of no significant impact. This notice serves as the Final Finding of No Significant Impact (FONSI) for the Solar PV Project located at Edison Job Corps Center, 500 Plainfield Avenue, Township of Edison, New Jersey 08817. The preliminary FONSI and the EA are adopted in final with no change.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →