BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2006/11/281 分钟阅读

Approval and Promulgation of Implementation Plans; Georgia: Removal of Douglas County Transportation Control Measure

本地自动翻译 · 来源原始语言

摘要

On September 19, 2006, the State of Georgia's Department of Natural Resources (DNR), through the Georgia Environmental Protection Division (GA EPD), submitted a final State Implementation Plan (SIP) revision to remove the transportation control measure (TCM) related to a compressed natural gas (CNG) refueling station/park and ride transportation center project in Douglas County, Georgia. This TCM was originally submitted by GA EPD for inclusion into the Atlanta portion of the Georgia SIP on August 29, 1997. EPA approved this TCM into the Georgia SIP through direct final rulemaking published in the Federal Register on June 24, 1998 (effective on August 10, 1998). Subsequently, the project sponsor determined that the equipment necessary to implement this project is no longer available, and thus this TCM cannot be implemented as originally anticipated. No SIP credit was claimed for this program, nor were emissions benefits ever realized for this TCM because it was never implemented. Through this rulemaking, EPA is approving the removal of this TCM from the Atlanta portion of the Georgia SIP because this SIP revision meets Clean Air Act (CAA) requirements.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →