本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2004/11/41 分钟阅读
Intent To Prepare a Joint Supplemental Environmental Impact Statement/Supplemental Environmental Impact Report for the Port of Los Angeles Channel Deepening Project Additional Disposal Capacity; Los Angeles County, CA
本地自动翻译 · 来源原始语言
摘要
The U.S. Army Corps of Engineers (Corps) is currently constructing the Channel Deepening Project. Disposal sites developed for the Channel Deepening Project have proven to be inadequate to provide disposal capacity for all sediments that require removal as part of the Channel Deepening Project. In addition, as identified in the project Feasibility Study, various berths located throughout the Port of Los Angeles (POLA) require dredging in order to accommodate deeper draft vessels that the Channel Deepening Project will allow to navigate the Main Channel.
来源原始语言: Federal Register — All Documents打开原始公告 →