国际贸易 · 2004/12/21 分钟阅读
Stainless Steel Sheet and Strip in Coils From Italy: Extension of Time Limit for Final Results of Antidumping Duty Administrative Review
本地自动翻译 · 来源原始语言
摘要
The U.S. Department of Commerce (the Department) is extending the time limit, from December 7, 2004, until no later than February 7, 2005, for the final results of the administrative review of the antidumping duty order on stainless steel sheet and strip (SSSS) in coils from Italy. The period of review (POR) is July 1, 2002, through June 30, 2003. This extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act).