BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

商业 · 2003/6/301 分钟阅读

Carson National Forest, New Mexico, Proposed 115kV Transmission Line on the Tres Piedras Ranger District

本地自动翻译 · 来源原始语言

摘要

Based upon a request made by Kit Carson Electric Cooperative (KCEC), the Carson National Forest is preparing an environmental impact statement (EIS) to analyze the effects of a proposal to authorize KCEC to construct, operate and maintain a new 115 kV electric transmission line and fiber optic system on National Forest System lands from the existing Ojo to Taos 115 kV line to Ojo Caliente, New Mexico. A notice of intent (NOI) to prepare an EIS was published in the Federal Register on October 12, 2000 (65 FR 60612). This revised notice adds information to the previous NOI and changes the proposed dates for release of the EIS.

来源原始语言: Federal Register — Agriculture Department打开原始公告 →

探索专题

商业洞察 →