BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2002/9/121 分钟阅读

Stainless Steel Sheet and Strip in Coils From France: Notice of Extension of Time Limit for Countervailing Duty Administrative Review

本地自动翻译 · 来源原始语言

摘要

The Department of Commerce is extending the time limit for the final results of review of the countervailing duty order on stainless steel sheet and strip in coils from France. The period of review is January 1, 2000, through December 31, 2000.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →