BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2002/11/131 分钟阅读

Stainless Steel Wire Rod from India: Extension of Time Limit of Preliminary Results of Antidumping Duty Administrative Review

本地自动翻译 · 来源原始语言

摘要

The Department of Commerce ("the Department") is extending the time limits of the preliminary results of the antidumping duty administrative review of stainless steel wire rod ("SSWR") from India. This review covers the period December 1, 2000 through November 30, 2001.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →