本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2002/12/101 分钟阅读
Stainless Steel Sheet and Strip in Coils from Italy: Extension of Time Limit of Final Results of Antidumping Duty Administrative Review
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce ("the Department") is extending the time limits of the final results of the antidumping duty administrative review of stainless steel sheet and strip in coils ("SSSS") from Italy. This review covers the period July 1, 2000 through June 30, 2001.
来源原始语言: Federal Register — All Documents打开原始公告 →