监管与法律 · 2003/7/171 分钟阅读
Drawbridge Operation Regulations; Gulf Intracoastal Waterway, Boca Grande, Charlotte County, FL
本地自动翻译 · 来源原始语言
摘要
The Coast Guard proposes to change the operating regulations and the name of the Gasparilla Island Causeway bridge, across the Gulf Intracoastal Waterway, mile 34.3, in Boca Grande, Florida. The proposed rule would require the bridge to open only two times an hour during the weekdays and four times an hour during certain times on the weekends and Federal holidays. This change would improve the flow of vehicular traffic while not significantly impacting navigation.