本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2001/12/51 分钟阅读
Certain Steel Concrete Reinforcing Bars from Turkey; Notice of Extension of Time Limit for Preliminary Results in Antidumping Duty Administrative Review
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce is extending the time limit for completion of the preliminary results of the administrative review of the antidumping duty order on certain steel concrete reinforcing bars from Turkey. The period of review is April 1, 2000, through March 31, 2001.
来源原始语言: Federal Register — All Documents打开原始公告 →