本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 1997/9/151 分钟阅读
Ferrosilicon From Brazil: Extension of Time Limits of Antidumping Duty Administrative Review
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce (the Department) is extending the time limits for the preliminary results in the administrative review of the antidumping duty order on ferrosilicon from Brazil, covering the period March 1, 1996 through February 28, 1997.
来源原始语言: Federal Register — All Documents打开原始公告 →