本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 1997/10/11 分钟阅读
Certain Stainless Steel Wire Rods From France: Extension of Time Limit for Preliminary Results of the Antidumping Duty Administrative Review
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce (``the Department'') is extending the time limit for the preliminary results for the third review of certain stainless steel wire rods from France. This review covers the period January 1, 1996 through December 31, 1996.
来源原始语言: Federal Register — All Documents打开原始公告 →