BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 1997/12/181 分钟阅读

Adjustments to 1988 Operating Criteria and Procedures (OCAP) for the Newlands Irrigation Project in Nevada

本地自动翻译 · 来源原始语言

摘要

This rule adjusts the 1988 Operating Criteria and Procedures (OCAP) for the Newlands Irrigation Project (Project). Adjustments are made to the Project efficiency requirements, maximum allowable diversion calculations, and Lahontan Reservoir storage targets in the 1988 OCAP to reflect current irrigated acreage, court decrees which have lowered the water duty applicable to certain Project lands, and other factors affecting water demand. To better manage diversions from the Truckee River to the Project, the rule provides flexibility to adjust the water supply in response to Project demand, flexibility in using snowpack and runoff forecasts, and extends the time frame for storing water in Truckee River reservoirs in lieu of diversions to the Project from the Truckee River.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →