Virginia Electric and Power Company (Surry Power Station Unit No. 2); Exemption
本地自动翻译 · 来源原始语言
摘要
Virginia Electric and Power Company (Surry Power Station Unit No. 2); Exemption
能源与环境 · 1995/3/101 分钟阅读
本地自动翻译 · 来源原始语言
摘要
Virginia Electric and Power Company (Surry Power Station Unit No. 2); Exemption
探索专题
商业洞察 →相关商业动态
6能源与环境 · 2026/8/27
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by NextEra Energy, Inc. (NextEra Energy), Dominion Energy, Inc. (Dominion Energy), Virginia Electric and Power Company (VEPCO), Dominion Energy Nuclear Connecticut (DENC), and Dominion Energy South Carolina, Inc. (DESC) (collectively the Applicants) on July 15, 2026. The application seeks NRC approval of the indirect transfer of the facility operating licenses, materials licenses, and general licenses for Surry Power Station, Unit Nos. 1 and 2 (Surry); North Anna Power Station, Unit Nos. 1 and 2 (North Anna); Virgil C. Summer Nuclear Station, Unit 1 (V.C. Summer); and Millstone Power Station, Units 1, 2, & 3 (Millstone); as well as the combined license for North Anna Unit 3; and the North Anna Early Site Permit. The application contains sensitive unclassified non-safeguards information (SUNSI).
阅读摘要 →能源与环境 · 2026/10/8
美国核电监管委员会 (NRC) 公告 SMR, LLC 提交的 Palisades SMR, LLC 的 Pioneer Unit 1 和 Pioneer Unit 2 的阶段性建设许可申请 - 限期工作授权 (LWA) 的第一部分。
阅读摘要 →能源与环境 · 2026/8/28
The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption in response to a request dated December 31, 2025, from SMR, LLC, on behalf of Palisades SMR, LLC, a wholly-owned subsidiary of Holtec International (collectively, Holtec) for approval to allow construction of permanent support of excavation walls prior to the issuance of a limited work authorization for Pioneer Units 1 and 2. The support of excavation walls will remain in place after construction is complete.
阅读摘要 →能源与环境 · 2026/8/26
美国核监管委员会 (NRC) 每周为期四个连续星期向公众通知,收到并获得了来自弗吉尼亚电力和电力公司的北安娜ESP-003早期现场许可证 (ESP) 更新申请.该网站作为Dominion Energy Virginia (dba) 业务.ESP的更新将允许执照人在建筑许可证或合并许可证申请中引用ESP-033在ESP所规定的时间之外的20年后再使用ESP-2027年.北安纳ESP现场位于弗吉尼西亚路易萨县,目前ESP 003截止日期于11月27日.
阅读摘要 →能源与环境 · 2026/8/26
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering issuance of an amendment to Renewed Facility Operating License No. NPF-76, issued to STP Nuclear Operating Company (STPNOC); Constellation South Texas, LLC; City Public Service Board of San Antonio; and City of Austin, Texas, for operation of South Texas Project, Unit 1 (STP). The proposed license amendment would, if granted, make a one-time exigent change to the technical specifications (TS) to extend the allowed outage time (AOT) for TS 3.7.1.7, "Main Feedwater System". This proposed amendment is being requested to facilitate repairs to the Unit 1 train D main feedwater isolation valve (MFIV). This proposed amendment is being requested under exigent circumstances pursuant to NRC regulations.
阅读摘要 →能源与环境 · 2026/8/24
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is issuing an order approving the application dated April 24, 2026, filed by Arizona Public Service Company (APS), on behalf of Public Service Company of New Mexico (PNM), Troy ParentCo LLC (Troy ParentCo), and their corporate affiliates (together, Applicants). The application sought NRC consent to the indirect transfer of control of PNM's co- ownership of the Renewed Facility Operating License Nos. NPF-41, NPF- 51, and NPF-74 for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively, as well as the associated general license for the Palo Verde Independent Spent Fuel Storage Installation (ISFSI) (together, the facility). No physical changes or operational changes to the facility were proposed in the application.