BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2010/9/132 分钟阅读

National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Rocky Mountain Arsenal Federal Facility

本地自动翻译 · 来源原始语言

摘要

The Environmental Protection Agency (EPA) Region 8 announces the deletion of portions of the On-Post Operable Unit (OU3), specifically the Central and Eastern Surface Areas including surface media and structures (CES), and the surface media of the Off-Post Operable Unit (OU4) (OPS) of the Rocky Mountain Arsenal Federal Facility (RMA) located in Commerce City, Colorado from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the surface media (soil, surface water, sediment) and structures (both former structures that have been demolished and structures retained for future use) within the CES and the surface media of the entire OPS. The rest of the On-Post OU, including groundwater below RMA that is west of E Street, and the groundwater that comprises the Off-Post OU will remain on the NPL and is not being considered for deletion as part of this action. Response activities will continue at those OUs. The EPA and the State of

来源原始语言: Federal Register — Environmental Protection Agency打开原始公告 →

探索专题

商业洞察 →